Value of contracted and completed construction works abroad, January – September 2026
In the period January – September 2026, construction enterprises completed construction works abroad totalling 33.1 million denars
In the period January – September 2026, the total value of contracted construction works abroad was 33 097 thousand denars, which is 72.2% less compared to the same period of the previous year.
In the specified period, the construction enterprises from the Republic of North Macedonia have completed construction works abroad totalling 33 097 thousand denars, which is 64.9% less compared with the same period of the previous year.
The values for the period January – September 2026, compared to the same period of 2025, are given on the basis of the parity 1 US dollar = 52.3050 denars.
Key takeaway
In the period January – September 2026, compared with the same period of the previous year:
- The value of contracted construction works abroad decreased by 72.2%
- The value of completed construction works abroad decreased by 64.9%